The first truss is being lowered into place by the crane.
Holding knee braces while the truss is set into place.
Truss #2 is ready and rigged to be lifted.
Doug guides the truss into place.
A tight fit is a good fit.
A view of the first two trusses.
The first ridge is flown in from above to connect the trusses.
The crane hook is poised for the third lift.
Truss #3 in flight.
The second crane day went smoothly and was documented by Matt Sircely, who generated hundreds of photos. It was difficult to choose only a few of the best to illustrate the process. For a Picasa album of many additional images, click here.
No comments:
Post a Comment