April 30: Windows!

From across the valley, the windows begin to appear.

First, the vertical windows were installed in the stair tower.

Another view...

More windows to come above the four on the south side.

The view from windows in the stair tower.

This is what Erik calls "Visible Progress." They were able to start installing windows this week, first in the stair tower, and then in the main timber frame section. (The lower level will remain closed in until the floor is cleaned and sealed.)