Monday, May 14, 2012

May 14: Timbers Arrive From the Sawmill

Rough sawn joists are unloaded at the site.

Rafters are next.

Some of Posts and Beams are unloaded, and placed on stickers

The timber package, including the post and beam material, joists, rafters, and siding was milled in February and stored at West Sound Lumber. As soon as the concrete work was completed, Erik arranged for Dave to truck the barn materials to the site.  The boomtruck provided an efficient way to unload the material.

No comments:

Post a Comment