Wednesday, May 9, 2012

May 9: Pouring the Concrete Slab



Slab forms are installed between piers with a rebar grid. 
Electrical conduit and a ground wire are placed prior to pouring concrete.




Sea Island returns without a pump truck this time to pour the slab.

Erik, with help from Rick, moves concrete around in between the forms.
The last section of the slab is filled.
Erik wheelbarrows some extra concrete down the hill to pour a pad at the bottom of the deck stairs.
Rick uses a power trowel to finish the slab surface.
The slab is finished, now we wait for it to cure.